There's no one price for a driveway, because no two drives are the same. Here's what actually sets the cost, and why Tommy gives you a written quote after a free survey rather than a guess.
What sets the price
The biggest factor is the size of the area. A drive for one car is a fraction of the material and labour of a drive for three, so the size sets the starting point for everything else. Tommy measures the area on the survey, so the quote is based on the real size of your drive, not a rough estimate.
Next is how much needs digging out and taking away. Some drives are laid over an old surface that can be dug out quickly; others have thick old concrete, tree roots or a big mound of soil that all need to be excavated and taken away in skips. The more waste there is, the more the job costs, because it's more digger time, more skips and more labour to clear it. Tommy looks at what's there now and how deep it goes before he quotes.
The ground underneath matters too. Soft or boggy ground needs a deeper sub-base than firm ground, and the sub-base is what stops the drive sinking and rutting later. A drive laid on a thin base over soft ground will move and dip within a year or two, so Tommy won't cut that corner to keep a price down. He checks the ground on the survey and builds the base to suit it.
The surface you choose changes the price as well. Block paving, resin, tarmac, gravel and imprinted concrete all cost different amounts per square metre, and some need more preparation than others. Resin needs a solid base underneath it; block paving needs a sub-base and jointing sand; tarmac is laid hot and needs edging. Each one is priced on its own, and Tommy will set out what each would cost for your drive so you can compare like for like.
Edging, borders and patterns add to the work. A simple straight edge is quick; a contrasting border, a chevron pattern or an inlay takes longer to lay and cut. The same goes for a soldier course around the edge or a contrasting band — they look smart, but they add cutting and laying time. Tommy will show you what's possible and what each option adds.
Drainage is another factor. If water needs a channel, a soakaway or a fall towards a border, that's extra work — but it's work that stops puddles and protects the house. A drive that holds water against the wall or runs it onto the pavement is a drive that'll cause trouble, so Tommy plans the drainage in and prices it in. It's not an extra he leaves you to sort out later.
Steps, walls or level changes add cost, because each one needs building properly rather than just surfaced over. A step up to the front door, a low retaining wall where the garden slopes, or a split-level drive all take brickwork or blockwork, and that's time and material on top of the surface itself.
Access matters too. If a mini digger and skips can get in easily, the job moves faster. Tight access — a narrow side passage, a front door that opens straight onto the pavement, or a back garden with no drive — means more work by hand and more barrowing, and that takes longer. Tommy checks the access on the survey so the quote reflects what's actually involved.
And finally, whether you need a dropped kerb. If there's no vehicle crossover already, the council's consent is needed before one can be put in, and that's a separate application to the highway authority. Tommy will tell you on the survey whether your drive needs one and who to apply to. See our dropped kerbs guide for who handles each area.
Why Tommy prices after a free survey
Because every one of those factors is different on every drive, any price given over the phone or from a photo is a guess. It might be too high, or it might be too low — and a too-low price usually means corners get cut somewhere, often in the dig-out or the sub-base, which are the parts you can't see but that decide whether the drive lasts.
So Tommy comes out, measures up, checks the levels, looks at the ground and the drainage, and talks through what you want. Then he prices the actual job, not an average job. He'll explain what he's found — the depth of the old surface, the state of the ground, where the water will go — so you understand why the quote is what it is.
The survey is free and there's no obligation. If you decide not to go ahead, that's fine. Tommy would rather you had a proper quote to think it over than a number that turns out to be wrong once work starts.
You can also use the survey to compare surfaces. If you're torn between block paving and resin, Tommy can price both for the same drive so you can see the difference and decide on the facts, not on a guess.
What the written quote shows
You get a clear written quote showing exactly what's included: the dig-out and waste removal, the sub-base, the edging, the drainage, the surface itself and the clean-up at the end. Each part is set out so you can see what you're paying for.
If something isn't in the quote, it's not in the job — so there are no surprises partway through. If you want something added, like a border or a step, Tommy will put it on the quote before any work starts, not add it on as an extra later.
If you have questions about the quote, Tommy will talk them through. He'd rather explain it than have you guess, and he's happy to go through any line you're unsure about. The point of a written quote is that you know what you're getting before you commit.
What the free survey covers
When Tommy comes out, he measures the area, checks the levels with a spirit level, looks at what's under the existing surface, and works out where the rainwater will go. He checks your access for machinery and skips, and whether you'll need a dropped kerb.
He also looks at anything that affects the job — old walls, tree roots, manhole covers, the damp-proof course on the house, and whether your home is in a conservation area. All of that goes into the quote, so the price you get is for your drive, not a standard one.
The survey usually takes less than an hour, and you get the written quote afterwards. There's no pressure to decide on the spot — take it away and have a think.
Common questions
Can you give me a price over the phone?
Not honestly, no. The size, the dig-out, the ground and the drainage all change the price, so Tommy prices after he's seen the drive. The survey is free.
What does the quote include?
Everything: the dig-out and waste, the sub-base, the edging, the drainage and the surface, plus the clean-up. If it's not on the quote, it's not in the job.
Is the survey really free?
Yes. Tommy comes out, measures up and gives you a written quote, free and with no obligation.
Need this done? Get a free quote.
Send your details and Tommy will call you back with a clear written quote — free, no obligation.
